​​​​​​​Work is covered from Monday, January 8 through Sunday, January 21

(Washington, DC) — This notice lists the alley, sidewalk, and road paving projects the District Department of Transportation (DDOT) currently plans to work on in the next two weeks.

Please Note: Work may be adjusted depending on weather and other conditions. During extreme cold and winter weather, construction work will likely be canceled or delayed. Additional projects may be added to this list. DDOT contacts residents and businesses within the work area before work commences. Unless otherwise noted, work is not conducted on weekends.

If you reside in or near any of the project areas, please be sure to remove your vehicles by the posted time, and encourage your neighbors to do likewise.

Road Paving Projects

18th Street NW and 19th Street NW Pavement Restoration Project

Monday, January 8, through Friday, January 12

DDOT will conduct brick sidewalk repair on 19th Street NW between L Street NW and M Street NW from Monday, January 11, through Friday, January 15. DDOT will also will restore sidewalks, driveways, curbs, gutters and ADA ramps on 18th Street NW between Pennsylvania Avenue NW and L Street NW.

Citywide Pavement Restoration Projects

As part of DDOT's commitment to improve and restore local roadways, work will be conducted at the following locations throughout the following two weeks, weather permitting:

  • Palisade Lane NW, between Loughboro Road NW and Dead End
  • 45th Street NW, between Warren Street NW and Van Ness Street NW
  • 45th Street NW, between Van Ness Street NW and Massachusetts Avenue NW
  • Cathedral Avenue NW between 29th Street NW and Woodley Road NW

Citywide Sidewalk Restoration Projects

As part of DDOT's commitment to improve and restore local sidewalks, work will be conducted at the following locations throughout the following two weeks, weather permitting:

  • 6th Street SE, between Brandywine Street SE and Chesapeake Street SE
  • 6th Street SE, between Mississippi Avenue SE and Savannah Street SE
  • Suitland Road SE, between Alabama Avenue SE and Southern Avenue SE
  • 19th Street NE, between L Street NE and M Street NE
  • Brandywine Street NW, between 36th Street NW and Reno Road NW
  • Holbrook Street NE, between Neal Street NE and Florida Avenue NE
  • Rodman Street NW, between Reno Road NW and Idaho Avenue NW

Pavement Markings

Pavement markings indicate which part of the road to use, provide information about conditions ahead, and, overall, are a vital part of communicating the traffic movement. DDOT’s striping season has now officially ended due to drop in temperature. Optimal striping weather is warm and sunny (45 degrees and above with low humidity). Cooler temperatures prevent successful paint application. During colder weather, DDOT installs, when and where needed, temporary roadway marking tape. The 2018 striping season will begin March 2018, weather permitting.

Contact Information
Please follow
@DDOTDC on Twitter to see regular updates and notices. For a more detailed look at DDOT’s Paving Plan click here, and visit DDOT’s blog, d.delivers. For more information about DDOT's alley improvements, click here. For constituent inquiries, please call (202) 671-2700. 
For media inquiries, please contact Terry Owens at (202) 763-8635, [email protected] or Michelle Phipps-Evans at (202) 497-0124, [email protected]

The mission of the District Department of Transportation (DDOT) is to enhance the quality of life for District residents and visitors by ensuring that people, goods, and information move efficiently and safely with minimal adverse impact on residents and the environment.

Follow us on Twitter for transportation-related updates and more; like us on Facebook and visit the website at www.ddot.dc.gov. Visit goDCgo.com for more information on transportation options in the District.