Text Resize

-A +A
Bookmark and Share

Temporary Off-Peak Lane Closure on Northbound South Capitol Street Bridge Over Anacostia River on January 20 2014

Friday, January 17, 2014

Temporary Off-Peak Lane Closure on Northbound South Capitol Street Bridge Over Anacostia River on January 20 2014

Washington DC - The District Department of Transportation (DDOT) has scheduled maintenance work on the South Capitol Street Bridge over the Anacostia River on Monday, January 20, 2014, from 10 am to 3 pm.

This work will require a temporary off-peak closure of the right lane on northbound (inbound) South Capitol Street near this bridge.

Temporary signs and traffic control measures will be in place to alert and guide the traveling public through the work zone. DDOT encourages all motorists to stay alert as they travel through the work zone.

For additional information about this work, please contact Project Engineer Eric Cole at (202) 671-4674.