Text Resize

-A +A
Bookmark and Share

Lane Closures for Inspection of Pennsylvania Avenue SE Bridge over Anacostia River on June 30 and July 1, 2014

Wednesday, June 25, 2014

Lane Closures for Inspection of Pennsylvania Avenue SE Bridge over Anacostia River on June 30 and July 1, 2014

Washington, DC - The District Department of Transportation (DDOT) will be conducting an inspection of the Pennsylvania Avenue SE Bridge over the Anacostia River, Anacostia Park Drive, M Street SE and CSX Railroad Tracks from Monday, June 30 to Tuesday, July 1, 2014.  This will require single-lane closures and take place during off-peak hours between 10 a.m. and 3 p.m., weather permitting.

The required lane closures and inspection activities are scheduled to occur as follows:

Monday, June 30, 2014
There will be a right-lane closure of eastbound (outbound) Pennsylvania Avenue over the Anacostia River, Anacostia Park Drive, M Street SE and CSX Railroad Tracks followed by a left-lane closure of eastbound (outbound) Pennsylvania Avenue SE.
Tuesday, July 1, 2014
There will be a right-lane closure of westbound (inbound) Pennsylvania Avenue SE over the Anacostia River, Anacostia Park Drive, M Street SE and CSX Railroad Tracks followed by a left-lane closure of westbound (inbound) Pennsylvania Avenue SE.

Traffic controls will be in place to warn motorists as they approach the areas.

Motorists are advised to stay alert while traveling through these locations and to be observant of the inspection personnel.