Mayor Vincent C. Gray

Search
DC.gov   DDOT

 

DDOT Logo

District Department of Transportation


Office Hours
Monday through Friday, 8:15 am to 4:45 pm

How to Reach Us
55 M Street, SE, Suite 400
Washington, DC 20003
ddot@dc.gov

Phone: (202) 673-6813
Fax: (202) 671-0650
TTY: (202) 673-6813

FOIA Information
Agency Performance

Website: http://ddot.dc.gov
Blog: http://ddotdish.com

DDOT Facebook  DDOT Twitter  DDOT YouTube  DDOT Flickr  DDOT Scribd 


Terry Bellamy
Director

Ask the Agency

Calendar: Meeting Events
Civil Rights: Equal Opportunity
Contracts: Procurement

Note: This is an external feed that may load slowly when Twitter traffic is high.

 
Text Size: A A A Print Friendly Print   Share Share  

11th Street Bridge Project 


11th Street Bridge ProjectThe District Department of Transportation (DDOT) began construction of 11th Street Bridge Project in December 2009 to replace the two existing bridges with three new bridges and improve the related interchanges. When completed in mid-2013, the $300-million the project will:

  • Improve mobility by providing separate freeway and local traffic connections to both directions of DC 295, the Southeast-Southwest Freeway and local streets on both sides of the Anacostia River,
  • Provide a shared path for pedestrians and bicycles, as well as rails to allow future streetcar connections,
  • Replace the existing functionally deficient and structurally obsolete bridges,
  • Provide an additional alternate evacuation route from our Nation’s Capital, and
  • Include new trail connections, improved drainage and other environmental investments.

Projected to serve almost 180,000 vehicles per day by 2030, the existing bridges lack connections to allow travel directly from southbound DC 295/Anacostia Freeway to the Southeast-Southwest Freeway or from the Southeast-Southwest Freeway to northbound DC 295. The two new freeway bridges will provide these connections. The third bridge will carry local traffic between city streets on both sides of the river and provide additional connections to both directions of DC 295.

The project is the largest ever constructed by DDOT and is the first river bridge replacement in the District in more than 40 years.

11th Street Bridge Rendering

Project at a Glance

Project Title: 11th Street Bridge Project
Providing Agency: District Department of Transportation
Office: Infrastructure Project Management Administration (IPMA)
Status: PROGRESS
Type: Renovation/Modernization
Start Date: July 17, 2009
Target End Date: July 10, 2013
Estimated Budget: $300,000,000
Location: 11th St Bridge, District of Columbia
Phone: (202) 484-2330

Milestones and Deliverables

11th Street Bridge Project:
Summer 2011: Open New SB DC/ I-295
Fall 2011: Open Two New Freeway Bridges
Winter 2012/13: Open New Local 11th Street Bridge
Summer 2013: Project Complete