Mayor Vincent C. Gray

Search
DC.gov   DDOT

 

between and go

DDOT Logo

District Department of Transportation


Office Hours
Monday through Friday, 8:15 am to 4:45 pm

How to Reach Us
55 M Street, SE, Suite 400
Washington, DC 20003
ddot@dc.gov

Phone: (202) 673-6813
Fax: (202) 671-0650
TTY: (202) 673-6813

FOIA Information
Agency Performance

Website: http://ddot.dc.gov
Blog: http://ddotdish.com

DDOT Facebook  DDOT Twitter  DDOT YouTube  DDOT Flickr  DDOT Scribd 


Terry Bellamy
Director

Ask the Agency

Calendar: Meeting Events
Civil Rights: Equal Opportunity
Contracts: Procurement
DDOT News: Subscribe

 


 
Text Size: A A A

February 15, 2012

Overnight Closure for Howard Road, SE Entrance Ramp to Northbound I-295 (Anacostia Freeway) Scheduled to Start at 9 pm Tomorrow 

Lane Closures and Intermittent 20-Minute Traffic Stoppages Will Also Apply to Northbound I-295 (Anacostia Freeway) Between Howard Road and 11th Street; Closures Required to Complete Emergency Roadway Striping and Sign Panel Modifications

Story at a Glance 

Share Share   Printer-Friendly Version Print

 

  • Lane Closures and Intermittent 20-Minute Traffic Stoppages Will Also Apply to Northbound I-295 (Anacostia Freeway) Between Howard Road and 11th Street;
  • Closures Required to Complete Emergency Roadway Striping and Sign Panel Modifications
Detour

Media Contacts

(Washington, DC) The District Department of Transportation (DDOT) will close the Howard Road, SE entrance ramp to northbound I-295 (Anacostia Freeway) tomorrow night from 9 pm to 5 am the following morning. Double right lane closures will also be implemented along northbound I-295 (Anacostia Freeway) between Howard Road, SE and 11th Street, SE tomorrow night from 8 pm to 5 am the following morning. Additionally, motorists will encounter intermittent 20-minute traffic stoppages along this stretch on Friday, February 17 between 12 am and 5 am. The lane closures and 20 minute traffic stoppages will allow crews to complete emergency striping and sign panel modifications at the Howard Road, SE entrance ramp to northbound I-295 (Anacostia Freeway) and along the I-295 northbound lanes.

During the ramp closure, signed detours will be posted.

Detours

  • Motorists will follow the posted detour along Howard Road, SE to Anacostia Park Drive, SE then onto eastbound Suitland Parkway to access northbound I-295.

Electronic signs will be in place to provide motorists advanced notice of the scheduled detour. Motorists are encouraged to use alternate routes.

In the event of inclement weather or other unforeseen conditions, this work will be rescheduled and an updated advisory will be distributed.

This closure is in addition to the previously publicized off-peak closures of the 11th Street bridges, related ramps, local streets, Southeast/Southwest Freeway and I-295/DC 295.

For more information about this work or the 11th Street Bridge Project, please contact DDOT Project Manager Ravindra Ganvir at (202) 359-6948 or visit www.ddot.dc.gov/11thStreetBridge.

  • Visit goDCgo.com Page will open in a new window. for more information on transportation options in the District.