Mayor Vincent C. Gray

Search
DC.gov   DDOT

 

between and go

DDOT Logo

District Department of Transportation


Office Hours
Monday through Friday, 8:15 am to 4:45 pm

How to Reach Us
55 M Street, SE, Suite 400
Washington, DC 20003
ddot@dc.gov

Phone: (202) 673-6813
Fax: (202) 671-0650
TTY: (202) 673-6813

FOIA Information
Agency Performance

Website: http://ddot.dc.gov
Blog: http://ddotdish.com

DDOT Facebook  DDOT Twitter  DDOT YouTube  DDOT Flickr  DDOT Scribd 


Terry Bellamy
Director

Ask the Agency

Calendar: Meeting Events
Civil Rights: Equal Opportunity
Contracts: Procurement

Note: This is an external feed that may load slowly when Twitter traffic is high.

 
Text Size: A A A

November 09, 2010

Notice of Public Availability for the Metropolitan Branch Trail Environmental Assessment 

The Metropolitan Branch Trail Environmental Assessment (EA) will be available for public review on November 15, 2010

Story at a Glance 

Share Share   Printer-Friendly Version Print

 

  • FHWA and DDOT announces that The Metropolitan Branch Trail Environmental Assessment (EA) will be available for public review on November 15, 2010.
Announcement

Media Contacts

Federal Highway Administration (FHWA) and District Department of Transportation (DDOT) announces that The Metropolitan Branch Trail Environmental Assessment (EA) and Section 106 review of historic properties will be available for public review on November 15, 2010. The EA analyzes a range of alternatives for a proposed multi-use trail located on National Park Service property.

The project area is adjacent to CSX railroad tracks and the WMATA Metro Red Line from the Fort Totten to the Takoma Station.

The Metropolitan Branch Trail (MBT) is a proposed 8-mile multi-use trail External Websites that runs from the Silver Spring Metro Station in Maryland to Union Station in the District of Columbia, generally following the path of the Metro’s Red Line. The MBT will help to complete a regional network of trails by joining the Capital Crescent Trail in Silver Spring, the National Mall near Union Station and the proposed Fort Circle Parks trail. In addition, the proposed spur of the MBT at Fort Totten will form a link in the East Coast Greenway network of trails. The MBT is intended to link people to jobs, schools, commercial and recreation areas and various Metro stations. This trail is much needed for transportation and recreation through many neighborhoods and industrial sections of the District.

EA Notice of Availability

What The EA will available for public review on November 15, 2010
When Monday November 15, 2010
10 am – 1 pm
Where
The EA will be available for review in its entirety in the related document section found below and also at the following District locations:
District Department of Transportation
Planning, Policy, and Sustainability Administration
2000 14th Street, NW, 7th Floor
Washington, DC 20009
National Park Service-Rock Creek Park
3545 Williamsburg Lane, NW
Washington, DC 20008
Martin Luther King, Jr. Memorial Library
901 G Street, NW
Washington, DC 20001


Comments may be submitted by email at heather.deutsch@dc.gov or by mail at the following address:

Heather Deutsch, Trail Planner,
Planning, Policy and Sustainability Administration,
District Department of Transportation,
2000 14th Street, NW, 7th Floor,
Washington, DC 20009

Comments must be received no later than December 15, 2010.

  • [PDF] This document is presented in Portable Document Format (PDF). A PDF reader is required for viewing. Download a PDF Reader or learn more about PDFs.

  • Page will open in a new window. The District government has provided links as a courtesy and is not responsible for information on websites outside the DC portal. Inquiries should be made to the sponsoring organizations.